Gujarat Floats 500 MW Wind Tender (Phase III) with Greenshoe Option
Reading Time: 1 minutesGujarat Urja Vikas Nigam Limited (GUVNL) has floated a tender for procurment of 500 MW of grid connected wind power. The power projects to be set up in Gujarat (Phase III) with ‘Greenshoe Option’ of additional upto 500 MW. The last date for proposal submissions is June 15, 2022, which will be … Continue reading Gujarat Floats 500 MW Wind Tender (Phase III) with Greenshoe Option
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed