Nordex Group Receives Order For 180 MW From Spain

0
241

Reading Time: <1 minutes

The Nordex Group scores in Spain with an order for 182.4 MW. The company will deliver 38 N155/4.8 turbines from the Delta4000 series for a wind farm to be built in the central of the country. The order also includes a service contract for the turbines covering a period of two years.

Delivery and installation of the turbines are scheduled to commence as of spring 2022 with commissioning following in the same year. The Nordex Group will install the Delta4000 turbines with a hub height of 120 metres on concrete towers, which the company will produce locally in Spain.

Together with this project the Nordex Group is currently installing wind farms totaling more than 720 MW in Spain. 

In its Plan Nacional Integrado de EnergĂ­a y Clima (National Integrated Energy and Climate Plan) (PNIEC) Spain has set itself ambitious targets for the development of renewable energy for 2021-2030. The plan envisages installing a total of 22 GW in wind energy over the coming 10 years in order to meet the target of 50,333 MW. This should mean that 74 percent of electrical power will be generated using renewable energy in 2030.

ALSO READ  KP Energy Commissions A Further 29.4 MW Of 250 MW Wind Project In Gujarat

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.