Suzlon Wins 39-MW Wind Power Project From Thermax Group’s First Energy

0
152
Representational Image. Credit: Canva.

Reading Time: 1 minutes

Suzlon, a provider of energy solutions, announced on Thursday that First Energy, a Thermax Group company, has awarded them a 39-MW wind power project. According to a corporate release, this order is a component of First Energy 5 Pvt Ltd’s 100-MW wind-solar hybrid project.

13 wind turbine generators (WTGs) with a hybrid lattice tubular (HLT) tower and a 3 MW rated capacity will be installed by Suzlon. The project, which would be in Tamil Nadu’s Tuticorin district and be placed there, is anticipated to be completed in 2024.

the company will comply with the terms of the agreement by providing the wind turbines (equipment delivery) and managing the project, including its erection and commissioning.

Additionally, Suzlon will offer complete post-commissioning operations and maintenance services.

“This is our first order with the (Thermax group) and features our 3 MW series product, which is one of the largest wind turbines in India right now,” J P Chalasani, CEO of the Suzlon company, said in a statement. “Suzlon is the right partner for us for this project,” said Ravi Damaraju, Director of First Energy, “as a leading provider of renewable energy solutions with tested technology.”

ALSO READ  Vena Energy and Vivant Energy Corporation Partner with Aboitiz Renewables for 206 MW San Isidro Wind Project in the Philippines

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.